RAIL PROJECT
Track reconditioning, precast concrete slab installation and post-tensioning at Wollar Creek.
140 m
Track reconditioning
2.4 m
Reconditioning depth
2
Separate work fronts
6 km
Access distance
THE SCOPE
140 m of track reconditioning either side of Wollar Creek to a depth of 2.4 m.
Installation of precast concrete slabs and post-tensioning.
Two separate work fronts were required, with access over a 6 km distance.
Working over water required strict environmental controls and working-at-height requirements.