RAIL PROJECT
Sleeper and timber renewal, rerailing and access logistics across five sidings and five turnouts.
293
Sleepers to replace
104
Timbers to renew
5
Sidings
5
Turnouts
THE SCOPE
Replacement of 293 sleepers across five sidings.
Renewal of 104 timbers across five turnouts.
Rerailing of seven legs and 10 closures during possession.
Access to the site is 4 km from the main gate.
With no direct access or working space at the worksite, the site is to be set up at Blue Street, with materials double-handled to site.