Author: admin-AR

  • Mastering Rail Project Excellence

    Mastering Rail Project Excellence

    Recently, we deployed our ZE85 for a demolition and excavation project at an aluminium can manufacturing facility. Traditional diesel-fueled machinery wasn’t suitable due to the risk of fumes and disruption to the delicate live facility. Enter our Hitachi ZE85, a zero-emission machine that operates quietly and efficiently in confined spaces.

  • Revolutionising Civil Projects

    Revolutionising Civil Projects

    Recently, we deployed our ZE85 for a demolition and excavation project at an aluminium can manufacturing facility. Traditional diesel-fueled machinery wasn’t suitable due to the risk of fumes and disruption to the delicate live facility. Enter our Hitachi ZE85, a zero-emission machine that operates quietly and efficiently in confined spaces.

  • ELECTRIFYING ANRIC

    ELECTRIFYING ANRIC

    MEDIA ELECTRIFYING ANRIC Hitachi ZE85 Electric Excavator In a pioneering move toward a more sustainable future in construction, Anric Group (Anric) recently made waves with its acquisition of a Hitachi ZE85 8.5 tonne 100% electric excavator from Hitachi Construction Machinery Australia (HCA). This strategic decision places Anric – a leader in rail and civil applications…

  • Technology and innovation drives Anric Group’s success

    Technology and innovation drives Anric Group’s success

    MEDIA Technology and innovation drives Anric Group’s success Established over forty years ago, Anric Group today stands an industry leader within the rail, industrial, commercial and residential sectors. Its success has been forged through a combination of its specialised technical team, focus on state-of-the-art rail technology and early adoption of emerging and custom construction tools…

  • Orange energy

    Orange energy

    MEDIA Orange Engery NSW-based rail and civil construction business Anric Group is pushing the envelope on sustainability with the introduction of a brand-new, fully electric Hitachi ZE85 excavator. A dedicated client of Hitachi Construction Machinery Australia (HCA), Anric Group founder Riccardo Spinozzi acquired a Hitachi UH063 excavator back in 1984. This excavator, refurbished over time,…

  • Hitachi and KTEG debuts mid-size electric excavator

    Hitachi and KTEG debuts mid-size electric excavator

    MEDIA Hitachi and KTEG debuts mid-size electric excavator New 8.7-tonne excavator claimed to be Australia’s first mid-range battery powered excavator Making its local debut at the 2023 National Diesel Dirt and Turf show in Eastern Creek (NSW) in April this year, the excavator boasts an output of 40kW and productivity comparable to a diesel machine’s…

  • HEATHCOTE ROAD RAIL BRIDGE

    PROJECTS Heathcote Rd, Road over Rail Bridge Early Works CLIENT Abergeldie LOCATION HOLSWORTHY, NSW START DATE SEPT, 2019 COMPLETION DATE SEPT, 2019 Construction of over 600m of combined services route (CSR) trenching excavated through class 2-3 sandstone, 3 double track underline crossings (ULX’s) and 4 OHW footings completed in a single 48 hour weekend possession.…

  • GREGORY HILLS INDUSTRIAL DEVELOPMENT

    PROJECTS GREGORY HILLS INDUSTRIAL DEVELOPMENT CLIENT PRIVATE CLIENT LOCATION GREGORY HILLS, NSW START DATE SEPT, 2021 COMPLETION DATE MAY, 2022 Design and Construct contract covering all scope from demolition and bulk earth works through to construction of warehouse space and landscaping. A full turnkey solution working closely with multiple stakeholders.   Previous Next Previous Next EXPERIENCE…

  • BMRC

    PROJECTS GOULBURN YARD CROSSOVER UPGRADE CLIENT JOHN HOLLAND LOCATION GOULBURN, NSW START DATE SEPT, 2020 COMPLETION DATE SEPT, 2020 Using our pair of brand new Colmar T10000 Road Rail Excavators we removed all redundant panels and installed all of the pre built panels required for the renewal of 117 ABC and 119AB points. This was…

  • Parramatta Light Rail

    PROJECTS Parramatta light rail (PLR) CLIENT PARRAMATTA CONNECT VALUE $7 MILLION START DATE FEB, 2021 COMPLETION DATE ON-GOING Provision of plant, labour and track support to construct 7km of dual ballasted track, 3 concrete bridges, slab track at Vineyard Creek and Adderton Road and the erection of overhead wiring (OHW) structures and jewellery between Rosehill…